Super User
Invoice Receipt
The Accounting and Tax Department informs all suppliers and contractors of the procedure and dates established for the filing of invoices and collection accounts for this period of 2018.
The only place authorized for the receipt of invoices is in the administrative office of the company Carrera 20, Calle 2 Barrio San Fernando, in the city of Santa Marta, directed to the Accounting Department.
No invoices and / or collection accounts will be received in the city of Bogota or other dependencies of the company.
The stipulated dates for receipt of invoices during the year 2018 are as follows:
NOTE: Invoicing will be received Monday through Friday from 8:00 AM to 12:00 PM.
When making any modification or updating of data such as: Name, Address, Telephone, Bank Account, Tax Responsibilities, Change of Regime, Economic Activity, RUT, Etc .; It is important that they send us this information to also update their data in the Administrative Management.
The date to be taken for the planning of payments, will be from the date of filing of the invoice or collection account (For the simplified regime).
The date to be taken for the planning of payments, will be the date of filing of the invoice or collection account (For the simplified regime).
These conditions will also apply to suppliers who are located at a different address than Santa Marta, so it is important that the invoice is sent by registered mail, taking into account the agreed dates for receipt of the invoices.
Records of Coal Mobilized
In recent years Fenoco S.A. has shown a significant advance in the maintenance service and in its operation, so the multinationals that exploit coal in the region of Province of Cesar, can transport this mineral, all this has been achieved thanks to the strengthening and improvement of the techniques through which the trains are mobilized on the railway line.
Following is a record by years of the tons of coal transported by the multinationals over the past twelve years:
Communications System
For the support of the ITCS system of the railway operation in general and of the different maintenance areas of Fenoco, there are different communication systems for the transmission of voice and data, based on different platforms and standards considered cutting edge technologies.
Tetra System
It is a standard defined by ETSI (European Institute of Telecommunications Standards) as a mobile digital radio system that unifies several alternative interfaces. This system is made up of several devices that allow voice and data communication between all actors of the railway operation, CTF, train masters, maintenance personnel, etc.
As end devices for the user, portable radios, mobile radios, base radios and RTPS are available. The management of the system is done through a redundant central node together with the different base stations installed along the railway track, which store and process the calls or data generated daily in the operation. In addition, all voice processes are stored in a recorder that is part of the management node. These records are used to follow-up and control of the communication protocols and investigation in case of incidents.
Fig. 1 Tetra Topology
WIFI y GPS System
This system is used for locating and recognizing trains from the beginning of the route to their arrival at their destination, constantly updating and checking information with the devices located in each railway station.
Transport network
As a transportation network, Fenoco installed more than 200 km of fiber optic in the section between La Loma (Cesar) and Ciénaga (Magdalena), which works in a redundant manner by having a second fiber backing path , management and traffic is carried out through redundant layer 2 switches installed in the railway stations, changeover booths and Data Center, resulting in a network in rings to avoid interruption in data transmission.
Weighing Equipment
You can know data such as the accuracy of the dynamic weighing for the entire train, accuracy of dynamic weighing per wagon related to the full scale range, accuracy of the dynamic weighing per bogie, maximum allowable speed variation during the weighing process.
MULTIRAIL Dynamic Weighing Scales
Click the pic to enlarge.
Accuracy of the Scale According to Speed
Precision of the dynamic weighing for the entire train: |
|
|
±0.5 at a speed of 10 - 30 km/h |
|
±1.0 at a speed of 30 - 50 km/h |
|
±1.5 at a speed of 50 - 70 km/h |
|
|
Precision of the dynamic weighing per wagon, related to the total range of the scale: |
|
|
±1.0 at a speed of 10 - 30 km/h |
|
±1.5 at a speed of 30 - 50 km/h |
|
±2.5 at a speed of 50 - 70 km/h |
|
|
Precision of the dynamic weighing per boogie: |
|
|
±2.0 at a speed of 10 - 30 km/h |
|
±3.0 at a speed of 30 - 50 km/h |
|
±4.0 at a speed of 50 - 70 km/h |
|
|
Precision of the dynamic weighing per axle |
|
|
±4.0 at a speed of 10 - 30 km/h |
|
±5.0 at a speed of 30 - 50 km/h |
|
|
|
|
Maximum speed variation allowed during the weighing process: |
|
|
V= ± 3km/h |
|
|
Calibration method: |
Dynamic Through a reference wagon, which has been previously weighed on a static scale by the client. |
Location and Communication Scale -CCO
Location of the scales:
La Loma: PK 749 +250.
Ciénaga: PK 930 + 270.
Safety Improvement
Operations Management and Track
Train Control System
The operation of the railway section concessioned to Fenoco is controlled through ITCS, which is a centralized traffic control system with virtual signaling and positive control of train speed, the main components and functionalities are described in the items described below.
Human Resource
The management of FENOCO S.A. is possible thanks to the work and commitment of more than 2600 people.
The human resource of FENOCO S.A. consists of about 600 direct employees and more than 2,000 indirect employees.
This interdisciplinary team is responsible for the administration, adaptation, operation and maintenance of the railway infrastructure of the north of Colombia.
The people that make possible the management of FENOCO S.A. are women and men, professionals and technicians trained in the different administrative and operational areas, mostly born in the areas where FENOCO S.A. develops its operation in the north of the country.
Human Resource Management
Mission
"Progress and safety on rails in the service of Colombia"
View
"In 2025, we will be the leading company in quality and service of maintenance and rail transport of Colombia, becoming a reference for Latin America.
Recognized for our world-class practices, safety, operational efficiency and the excellence of our human talent, always committed to the integral development of communities, industry competitiveness and sustainability of the country. "
Corporate Values
- Respect
- Commitment
- Security
- Integrity
- Excellence
Applicable Regulations
The following documents are related to the applicable regulations: